Assembly Process at Dismargroup
Sahada Güven, Detayda Ustalık
Success in exterior facade applications is not limited to design and production; one of the most critical stages that determines the final quality is the assembly process. Dismargroup adopts an engineering-based, systematic and safe approach in the field application of aluminum exterior facade systems.
Each assembly process is planned with detailed field analyses before the project starts. During the implementation phase, the process is carried out in line with project-specific drawings and technical documentation. Our experienced assembly teams are organized to fully adapt to the construction site conditions and each stage progresses under engineering supervision.
All equipment used during assembly is selected in accordance with safety and occupational health standards. Critical steps such as working at height, scaffolding systems, crane and platform applications are carried out in accordance with Dismargroup's field safety protocols.
In addition, thanks to the system details prepared during the production phase, the installation time on site is minimized; this both reduces labor costs and ensures full compliance with the project schedule. Placing each façade element in the correct position and with high precision forms the basis of façade performance and visual integrity.
Dismargroup sees installation not only as an implementation process but also as a strategic phase that adds value to the project. With the principles of correct planning, technical expertise and on-time delivery, we build long-lasting and problem-free systems on the exterior.